Gallery: Intermediate Results

We can finally show some cleaned up images after the long festival summer! #studio #construction #studioblog #klangkellerei

We’ll present these sorted by room.

Control Room 3

This is the current state of our control room 3 – we’re using it as a break room, since it is quite clean for the moment.

View from the tech room

Long Hall

After taking down the insulation and some serious cleaning the long hall that will house a large live room and the main control room later looks like this:

View from Tech Room
View from the north
the south part (dark part in the picture above)
This lies behind the concrete wall (above picture)

The Lounge

This is the lounge without it’s flooring:

We’re preparing to throw out the old wood and sorting it.
The large rectangular cut-out is actually a fresh air inlet. It’s huge.

Facilities

We inherited a way-too-large fresh air system that will ultimately have to go. It takes up two whole rooms and generally is quite impressive:

The Great Hall

In the back of the building we have the „great hall“ underneath a ’new‘ part of the building from the 1950ies with an impressive 4,80m room hight. Currently it is a mess as we’re still clearing out the old part of the house.

That center door is a handcrafted goods lift from 1952.
The „Great Hall“ – a landfill… top left: the 75CM air pipe.