Dismantling the club, Episode IV

After some serious tidying we present to you pictures of the current state of affairs – somewhat cleaner now! – and some images from construction sites in the hallway …

… where we had what first looked like dew water underneath the steel grid on the ceiling.

In the above image there is trash furniture in the foreground and the stairway to the rest rooms in the back.

This way, please…
Yeah, turned out the building’s not so cool with rain in this area. A company will have to fix the leak soon.

The small room we almost cleaned out by now will become a small control room for producing and arrangement and some minor tracking:

The room features a fancy terrazo floor and is generally clean now.
Brassy drawings on the wall.
Oh boy, obscene! ! *brithish accent*
White-washed vauled. Nice.

The adjacent room connects the long hall and the hallway to the newer part of the building.

The dark alley to the newer part of the house
View to the northern part of the long hall.
Tools. And the small future control room in the back.

The heap of mineral wool in the long hall is yet growing over our heads.

Just the material from off the walls…

Some shots of the excavated artifacts shall be included in this article as well:

Electronics; ranging from up-to-date- back to pre-historic times when they made electricity with rocks. Mhmm.
Old iron and metal heap.
Hahaha – those were people who knew the trve meaning of humor!
Some more mouldy interior.

The wardrobe area minus a ton of unaccounted stinky clothes and umbrellas. Bagged and tagged.
The ceiling construction in the hallway minus the gipsum board / mould formwork.

Merken

Posted in Allgemein